County plans two road projects on Roscoe Road to the bridge

An Open House Public Hearing will be held November 5, 2025 at Roscoe Village Hall.

County plans two road projects on Roscoe Road to the bridge
Improvements to Roscoe Road are planned from Old River Road to the Rock River Bridge.

The Winnebago County Highway Department (WCHD) announced that an Open House Public Hearing has been scheduled from 5:00 P.M. to 7:00 P.M. on November 5, 2025 at Roscoe Village Hall, 10631 Main St., Roscoe, Illinois 61073, for the purpose of discussing two separate projects (SN 101-3016):

  • Rehabilitation of the Roscoe Road bridge over the Rock River (IL Special Bridge funding) - repairing the existing steel beams, replacing the expansion joints, bearings, bridge rail, bridge deck and guard rails.
  • Improvements to Roscoe Road from Old River Road to the Rock River (HSIP/Safety funding) - pavement widening and paving shoulders, resurfacing, installation of shoulder and centerline rumble strips, high visibility pavement markings, extension of existing box culverts, new pipe culverts and improvements at the intersection with Gleasman Road to provide a westbound left turn lane.

Engineering drawings, maps and aerial photography, will be available for inspection and viewing during the entire time the WCHD representatives are present. This same material currently is available for review and inspection at the Highway Department office at 424 N. Springfield Avenue, Rockford, IL 61101.

Winnebago County Highway Department is in the process of preparing environmental reports for the bridge and roadway projects in accordance with the National Environmental Policy Act of 1969 and IDOT's Public Involvement Process.

All persons interested in these projects are invited to attend the hearing to express their views and comment on the project(s). This meeting will also serve to involve and obtain the views of the public about potential project impacts to the adjacent properties. The bridge rehabilitation will require closing Roscoe Road for approximately 5 months which may be an effect to local businesses and adverse travel.

The meeting will be conducted on an informal basis with projects displays and other information available for viewing. WCHD representatives and IMEG (consultant for the bridge project), will present an overview of both projects at 5:15 pm and again at 6:00 pm and will be available to answer individual questions and record comments offered by those in attendance. An opportunity will be made available for participants to comment on the project and these verbatim comments will be made part of the public record.

The location of the hearing is accessible to persons with disabilities. If special accommodations or assistance are needed, please contact the individual listed below by October 31, 2025.

For more information, contact Carlos Molina, County Engineer, or Matt Fox, Project Engineer, 424 N. Springfield Ave, Rockford, IL, 61101, telephone 815/319-4000, fax 815/319-4001, email cmolina@hwy.wincoil.gov or mfox@hwy.wincoil.gov.

Comments and questions regarding both projects will be accepted until November 14, 2025.